Naver Data Center GAK

  • Power Capacity 40 MW
  • Location Chuncheon, Gangwon-do
  • Site Area 29,384 ㎡
  • GFA 46,643 ㎡
  • Completion Apr. 2013
  • Build Size 1 Main Office(B3 ~ 2F)
    3 Sever Bdlgs.(B2 ~ 3F)